Wednesday 20 February 2013

Slow Progress

The outside thermometer read 2 degrees, but the wind made it feel well below freezing. The children only managed a few sessions outdoors, and only then with much cajoling. Both Helen and I were on fence clearing duty today, all of the waste wood going straight on the bonfire. We have burn our way through 3 gates, a hedge, a door frame, a post box and half a shed. The cold made it slow progress, with regular pauses to defrost our fingers at the fire.
A stop to fix a water leak in the bathroom did not help, or the failed attempt to turn over the boat engine. I now smell of a mixture of wood preservative and petrol.
Here is a photo of Helen at work.


The fence wood and posts arrived in late morning from the local wood yard, a very reasonable price that made me realise what a bad deal you get from the big diy chains. In this photo you can see the stretch that has been cleared for the new fence. I should add that Helen has done most of the work to clear this space as her cut hands bear out.

The first fence panel can be seen propped up in the bottom left of the picture. Lets hope that tomorrow brings better weather, the forecast is not good :-(

No comments:

Post a Comment